Friday, December 16, 2011

December 16, 2011

As you drive by Waldorf West, you'll see most of the outside of the building is nearing completion, complete with native trees and landscaping. However, we still have the inside to complete---our winter project.

Tuesday, October 4, 2011

October 4, 2011

If you drive past the construction site this week, you'll notice the blue roof, thus the term "under roof".

Tuesday, July 26, 2011

July 26, 2011

The building is now at 55% completion.
For the next few months, digging, trenching, and infrastructure are in progress.
Phone, data, electricity, water---all the elements that are needed to get a building totally enclosed.
Thank you to all of the construction workers who have been battling the summer heat index.
Check out the latest article in the Maryland Independent that ran on Wednesday, July 20th by
going to http://www.somdnews.com/ and putting Waldorf West into the search field.

Thursday, June 9, 2011

June 9, 2011

We are now at 41% completion. The brick is arriving and you'll see the outer shell of the building start to emerge. Thank you for following our progress.

Monday, May 23, 2011

Monday, May 23, 2011

The skylight is going in this week and nearing completion. We are now at the 34% progress mark.
It was impressive to see the skylight go in, one glass pane at a time. A butterfly flew up and rested on
one of the beams.

Tuesday, May 10, 2011

Waldorf West

The dual front entrance is now visible. As of May 9, 2011, we are at 31% completion. The atrium is the highest point of the building and stands above the entrance.

Tuesday, April 19, 2011

April 19, 2011

We have now reached 25% completion.
The 2nd floor cement has been poured.
Thank you for checking out our progress.

Wednesday, March 2, 2011

March 2, 2011

We're now at 10% completion.
The weather has been cooperating. The foundation is in.
One of the most important parts of the building was delivering the steel.
The steel is fabricated off site and then brought to the buidling. Putting the steel in place where it
needs to be located is called "swinging the steel". Enjoy the photos---after the foundation, it's all
about the steel---soon we will be seeing the shell of the building.

Tuesday, February 15, 2011

Progess Date: February 14, 2011

We broke ground for the Waldorf West branch on September 1, 2010.
As of February 14th, we are at 5% completion of the project.
Prior to February 14th, we had snow, ice, sleet, mud, and slush.
I take photos each week of the same three angles.
"A" is from the work trailer (and actually what will end up being the front of the building)
"B" is the street side of the building (and where the meeting rooms will be)
"C" is the side of the building nearest to the Hilton Garden Inn

Angle A

 

Angle B

Angle C